Install a manual shutoff valve between the gas meter
and unit within six feet of the unit. If a union is installed,
the union must be downstream of the manual shutoff
valve, between the shutoff valve and the furnace.
Tighten all joints securely.
Connect the furnace to the building piping by one of
the following methods:
Rigid metallic pipe and fittings.
Semi-rigid metallic tubing and metallic fittings.
Aluminum alloy tubing must not be used in exterior
locations.
Use listed gas appliance connectors in accordance
with their instructions. Connectors must be fully in
the same room as the furnace.
Protect connectors and semi-rigid tubing against
physical and thermal damage when installed.
Ensure aluminum-alloy tubing and connectors are
coated to protect against external corrosion when
in contact with masonry, plaster, or insulation, or
subjected to repeated wetting by liquids such as
water (except rain water), detergents, or sewage.
Drip Leg
Ground Joint Pipe Union
To Be Installed Ahead of
Gas Valve
Reducing Coupling
1/2” x 1/8” with 1/8”
Pipe Plug to Measure
Line Gas Pressure
Height Required
By Local Code
Location of Manual Valve
(Installed Ahead of
Ground Joint Pipe Union)
``
General Furnace Layout
UPFLOW I NSTALLATIONS
When the gas piping enters through the right side of the fur-
nace, the installer must supply the following fittings (starting
from the gas valve):
Close nipple.
90 degree elbows.
Straight pipe to reach the exterior of the furnace .
A ground joint union, drip leg, and manual shutoff valve must
also be supplied by the installer. In some cases, the installer
may also need to supply a transition piece from 1/2" to another
pipe size.
When the gas piping enters through the left side of the furnace,
the installer must supply the following fittings (starting from the
gas valve):
90 degree elbow.
Straight pipe to reach the exterior of the furnace.
A ground joint union, drip leg, and manual shutoff valve
must also be supplied by the installer. In some cases,
the installer may also need to supply a transition piece
from 1/2 inch to another pipe size.
COUNTERFLOW I NSTALLATIONS
When the gas piping enters through the left side of the furnace,
the installer must supply a straight pipe and a 90 degree elbow
to reach the exterior of the furnace.
A ground joint union, drip leg and manual shutoff valve must
also be supplied by the installer. In most cases, the installer
may also need to supply a transition piece from ½” to another
pipe size. When the gas piping enters through the right side of
the furnace, the installer must supply the following fittings (start-
ing at the gas valve):
Close Nipple
90 Degree Elbow
Straight Pipe to Reach Exterior of Furnace.
GAS P IPING C HECKS
Before placing unit in operation, leak test the unit and gas con-
nections.
T
O
AVOID
THE
POSSIBILITY
OF
EXPLOSION
OR
FIRE
,
NEVER
USE
A
MATCH
OR
OPEN
FLAME
TO
TEST
FOR
LEA KS
.
WARNING
Check for leaks using an approved chloride-free soap and wa-
ter solution, an electronic combustible gas detector, or other
approved testing methods.
NOTE: Never exceed specified pressures for testing. Higher
pressure may damage the gas valve and cause subsequent
overfiring, resulting in heat exchanger failure.
Disconnect this unit and shutoff valve from the gas supply pip-
ing system before pressure testing the supply piping system
with pressures in excess of 1/2 psig (3.48 kPa).
This unit must be isolated from the gas supply system by clos-
ing its manual shutoff valve before pressure testing of gas sup-
ply piping system with test pressures equal to or less than 1/2
psig (3.48 kPa).