Goodman Mfg VC8 User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
8
L
OCATION
R
EQUIREMENTS
AND
C
ONSIDERATIONS
Top - 1"
Side
Clearance - 1"
Back - 0"
Front Clearance - 3"
V
ent Pipe Clearance to Combustibles-
6" using Single Wall Connector or 1"
using B-1 vent.
Adequate combustion/ventilation air must be supplied
to the closet.
Furnace must be completely sealed to floor or base.
Combustion/ ventilation air supply pipes must
terminate 12" from top of closet and 12" from floor of
closet. DO NOT remove solid base plate for side
return.
Return air ducts must be completely sealed to the
furnace and terminate outside the enclosure surfaces.
CLEARANCES AND A CCESSIBILITY
Unobstructed front clearance of 24" for servicing is recom-
mended.
TOP
B1-VENT SINGLE
(PLENUM)
1" 6" 1" 3" 0" 1"
VENT
SIDES FRONT BACK
Top clearance for horizontal configuration - 1"
HORIZONTAL I NSTALLATION (*MVC8 MODELS O NLY)
Line contact to framing is permitted when installed in the hori-
zontal configuration. Line contact is defined as the portion of
the cabinet that is formed by the intersection of the top and
side. ACCESSIBILITY CLEARANCE, WHERE GREATER,
SHOULD TAKE PRECEDENCE OVER MINIMUM FIRE PRO-
TECTION CLEARANCE. A gas-fired furnace for installation in
a residential garage must be installed so that the ignition source
and burners are located not less than eighteen inches (18")
above the floor and is protected or located to prevent physical
damage by vehicles. A gas furnace must not be installed di-
rectly on carpeting, tile, or other combustible materials other
than wood flooring.
FURNACE S USPENSION
If suspending the furnace from rafters or joist, use 3/8" threaded
rod and 2”x2”x3/8” angle iron as shown below. The length of
rod will depend on the application and the clearances neces-
sary.
hydrochloric acid
cements and glues
antistatic fabric softeners for clothes dryers
and masonry acid washing materials
If the furnace is used in connection with a cooling unit,
install the furnace upstream or in parallel with the
cooling unit coil. Premature heat exchanger failure
will result if the cooling unit coil is placed ahead of the
furnace.
If the furnace is installed in a residential garage,
position the furnace so that the burners and ignition
source are located not less than 18 inches (457 mm)
above the floor. Protect the furnace from physical
damage by vehicles.
If the furnace is installed horizontally, the furnace
access doors must be vertical so that the burners fire
horizontally into the heat exchanger. Do not install
the unit with the access doors on the “up/top” or “down/
bottom” side of the furnace.
Do not connect this furnace to a chimney flue that
serves a separate appliance designed to burn solid
fuel.
For counterflow installations, the air conditioning coil
must be downstream from the heat exchanger of the
furnace.
Counterflow installation over a noncombustible floor.
Before setting the furnace over the plenum opening,
ensure the surface around the opening is smooth and
level. A tight seal should be made between the furnace
base and floor by using a silicon rubber caulking
compound or cement grout.
Counterflow installation over a combustible floor. If
installation over a combustible floor becomes
necessary, use an accessory subbase (see
Specification Sheet applicable to your model for details).
A special accessory subbase must be used for upright
counterflow unit installations over any combustible
material including wood. Follow the instructions with
the subbase for proper installations. Do not install the
furnace directly on carpeting, tile, or other combustible
material other than wood flooring. (NOTE: The subbase
will not be required if an air conditioning coil is installed
between the supply air opening on the furnace and the
floor.